期刊文献+

工作研究在电器产品装配线平衡改善中的应用 被引量:3

Application of Work Study in Improvement of Electric-product Assemble Line
下载PDF
导出
摘要 针对粗放管理模式下温州企业普遍关注挖掘企业内部潜力,增强企业竞争力的问题,以温州某电器产品的装配生产线为研究对象,在运用程序分析方法规范产品生产工艺流程的基础上,采用秒表时间研究识别了生产线的瓶颈工位,通过工序重排、人员调整以及基于双手作业分析和动作分析的作业方法改进,使得生产线的平衡率提高了31%. The manufacturing industries focus their at tentions on how to dig potential productive ability and en hance competitive ability. Taking an electric company's Lean production line as the research object, this paper makes the manufacture process standardization by use of program anal ysis and measures the standard time using stopwatch, and gets the bottleneck operation. Then through the Two Hand operation analysis and motion analysis of the bottle neck operation, there is an evident increase in line balance rate. Methods of line balancing improvement introduced by this paper provided a reference for the extensive management companies of Wenzhou
出处 《成组技术与生产现代化》 2011年第4期5-10,21,共7页 Group Technology & Production Modernization
基金 浙江省自然科学基金资助项目(Y6110045) 温州大学实验室开放项目(11SK74A)
关键词 工作研究 生产线平衡 秒表测时 作业 分析 work studyline balancing stopwatchmeasurement operation research
  • 相关文献

参考文献4

二级参考文献7

共引文献73

同被引文献10

  • 1贵文龙.工作研究方法在企业中的应用分析[J].工业工程与管理,2006,11(4):123-126. 被引量:14
  • 2Fontaine Robert J,Lee Timothy D,Swinnen Stephan P. Learn- ing a new bimanual Coordination pattern: reciprocal influences of intrinisie and to-he-learned patterns[J]. Canadian Journal of Experimental Psychology, 1997, S 1 (1) : 1-9.
  • 3Knut Drewing, Mareike Hennings, Gisa Aschersleben. The contribu- tion of tactile reafference to temporal regularity during bimanual fin- ger tapping[J]. P. 63sychological Research, 2002,66 (1) : 60-70.
  • 4Weigelt Matthias, Rieger Martina, Mechsner Franz. Target re- lated coupling in bimanual Reaching movements[J]. Psycho logical Research, 2007,71(4) : 438-447.
  • 5Habas Christophe, Emmanuel Alain Cabanis. The neural net- work involved in a bimanual Tactile-tactile matching discrimi- nation cask: a functional imaging study at 3 T[J]. Neuroradiol- ogy,2007,49(8) :681-688.
  • 6Gavin Buckingham, David P Carey. Attentional asymmetries-cause or consequence of human right handedness[J]. Frontiers in Psy- chology, 2014,5 : 1587-1599.
  • 7易树平,郭伏.基础工业工程[M].北京:机械工业出版社,2001:38-40.
  • 8宋春立.工业工程及其在我厂的应用——时间研究[J].机械工艺师,1990(12):2-4. 被引量:1
  • 9曾敏刚,李双.电源适配器生产现场改善与装配线平衡[J].工业工程,2010,13(4):117-123. 被引量:18
  • 10刘晓卉,许志沛,薛顺,崔萍,洪浩.工作研究在企业生产现场管理中的应用[J].现代制造工程,2012(2):57-60. 被引量:11

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部