小湾水电站坝身钢衬制造安装工艺设计 被引量:2

Design of Xiaowan Hydroelectric Dam Liner Manufacture and Installation
下载PDF
导出
摘要 叙述了小湾水电站大坝钢衬制造安装施工难点,提出,对施工过程进行了工艺设计优化,从钢衬制造安装关键工艺采取了一系列行之有效的措施,使施工质量达到设计要求,施工进度满足合同工期要求。 By analyzing the construction difficulties of steel liner manufacture and installation at Xiaowan hydroelectric dam,the writer point out the optimization design of the construction process,take series of effective measures of optimization process in manufacture steel liner installed,the quality of construction meet the design requirements,construction progress schedule is meet the contract requirements.The Xiaowan power station Steel liner construction problems was solved,and to achieve a high record, it can provide reference for other similar project.
出处 《能源与节能》 2011年第10期71-73,77,共4页 Energy and Energy Conservation
关键词 小湾水电站 大坝钢衬 制安工艺 质量控制 Xiaowan hydroelectric dam steel liner manufacture and installation process quality control
  • 相关文献

同被引文献7

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部