摘要
针对青铜峡水电站9号机调速器的技术改造,叙述了WBST-100-40型水轮机调速器的配置、功能和工作原理以及安装调试,为宁夏青铜峡水电站在今后的调速器改造工作提供参考。
According to the technological innovation of No.9 machine governor in Qingtongxia Hydropower Station,this paper introduced WBST-100-40-type turbine governor configuration,functions and working principle as well as installation and commissioning,provide a reference for Hydropower Station in the future governor transformation.
出处
《能源与节能》
2011年第10期85-87,共3页
Energy and Energy Conservation
关键词
步进电机式调速器
改造
安装
试验
stepping motor type governor
transform
installation
test