结合中电投江西公司景德镇电厂2×660MW超超临界机组现场调试过程中及机组转入正式商业运行后部分因DCS逻辑方面不完善而出现的问题和处理过程,根据本厂实际情况提出改进措施,对实施效果进行阐述,希望对同类机组的调试和生产具有一定的借鉴作用。
According to logic problems due to the imperfect in DCS and its processes during the on-site commissioning process and after into the formal commercial operation of the 2 × 660 MW supereritical generating units in Jingdezhen Power Plant of China Power Investment Corporation Jiangxi Branch, and also in accordance with the plant's actual situation, the improvement measures are advanced and its implement effects are elaborated, wanting to have some reference in the debugging and production of the similar units.
出处
《能源研究与管理》
2012年第1期41-43,共3页
Energy Research and Management
关键词
超超临界机组
逻辑
改进
前馈控制
ultra-supercritical unit
logic
improve
feed-forward control