摘要
论述了玻璃钢化粪池安装施工技术,利用整体一次吊装就位和内外同步逐级加压对称夯填法,保证了化粪池基础回填土的密实度和均匀性,避免化粪池在安装和使用过程中的变形损坏,保证了安装质量。
This paper discusses the LGHFC installation technology, uses symmetry dynamic filling method of overall hoisting and symmetric in- ternal-external grading, which guarantees the compactness and evenness of the backfilling soil of LGHFC foundation, avoids deformation damage of LGHFC in the installation and usage, and ensures installation quality.
出处
《山西建筑》
2012年第9期125-126,共2页
Shanxi Architecture