摘要
对PPP项目的移交阶段进行了分析研究,应用多层模糊综合评判法建立了相应的数学模型,对PPP项目的运营状况进行了综合模糊评价,进而获得项目的具体运营状况,以保障项目移交后项目发起人的合法利益。
This paper analyzes and studies PPP project handover phase, establishes corresponding mathematical model by applying multilayer fuzzy quality synthetic evaluation method, carries out synthetic fuzzy evaluation on the operation condition of PPP project, and acquires its specif- ic operation conditions, with a view to guarantee the legal benefits of the project sponsor after the project handover.
出处
《山西建筑》
2012年第9期259-260,共2页
Shanxi Architecture
关键词
PPP项目
项目移交
多层模糊综合评价
PPP project, project handover, multilayer fuzzy quality synthetic evaluation