期刊文献+

重力有压输水系统主线调节阀关闭水锤计算 被引量:7

Water hammer calculation on the main regular valve-closed condition in gravity pressure water conveyance system
下载PDF
导出
摘要 在对关阀水锤的机理进行研究的基础上,应用MATLAB高级计算语言平台,对重力有压流管道部分阀门瞬时关闭情况下不同的水锤工况进行了瞬变流计算。 Based on the research on the principle of valve-closed water hammer, with the application of MATLAB programming language platform, the water hammer process at different valve closing operating conditions within the pipe system has been calculated.
作者 高婧宇 车威
出处 《阀门》 2012年第1期29-32,共4页 VALVE MAGAZINE
关键词 调节阀 水锤 输水主线 MATLAB water hammer main regular valve MATLAB
  • 相关文献

参考文献6

  • 1Vives C.Electfomagnetic refining of aluminum alloys by the CREM process:Part I.Working principle and metallurgical results[J].Metall Trans B,1989,20B:623.
  • 2Radjai A,Miwa K.Effect of intensity and frequency of electromagnetic vibration on the microstructural refinement of hypoeutectic Al-Si alloys[J].Metall Trans A,2000,31A:755.
  • 3Misra A K.Anovel Solidification technique of metals and alloys:under the influence of applied potential[J].Metall Trans A,1985,16A:1354.
  • 4[美]E B 怀利,V L 斯特里特.瞬变流[M].北京:水利电力出版社,1983.
  • 5[加]MH乔德里 陈家远 译.实用水力过渡过程[M].成都:四川省水力发电工程学会,1985..
  • 6刘志勇,刘梅清,蒋劲,赵文胜.重力有压输水系统水锤及其防护研究[J].中国农村水利水电,2008(10):79-81. 被引量:20

二级参考文献5

共引文献28

同被引文献58

引证文献7

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部