摘要
介绍了国家 1998年计划工程———鄱阳湖区二期防洪工程的监理情况 ,并结合本工程监理工作中遇到的一些问题 。
This paper introduced the supervision situation of the state scheduled project (1998)—The poyang Lake regional second-stage flood control project.Combined with the encountered problems in engineering supervision work,there had been explained the knowledge with the bank engineering supervision work and the countermeasure of soluing problem of bank project supervision work at present.