小湾水电站厂房进水口高边坡稳定性研究 被引量:2

Study of Powerhouse Intake High Slope Stability for Xiaowan Hydropower Project
下载PDF
导出
摘要 围绕小湾电站厂房进口高边坡的稳定性问题 ,利用前期研究中开发的岩体分类、软弱夹层的取样、试验和分析方法、结构面网络模拟、边坡稳定的极限分析等成果 ,在进一步发展完善的基础上进行了综合研究。研究结果表明 ,f3断层对进水口边坡的稳定性起着控制作用 ,由 f3断层和卸荷裂隙组合形成的楔体破坏是小湾电站厂房进口最典型也是最主要的失稳模式。因此 ,本文将重点介绍对 f3断层进行的专门试验以及对 To solve the powerhouse intake high slope stability problem for the Xiaowan Hydropower Project a further comprehensive study was made based on the results of rock mass classification, sampling of soft seams, test and analysis, shearing plane network simulation and slope stability limit analysis developed in the early stage study . The study results reveal that the fault f3 has control of the intake high slope stability, and the wedge-shaped failure caused by combination of the fault f3 and the relaxed fissures is a principal instability pattern of the Xiaowan powerhouse intake structure. This paper gives priority to a presentation of the special tests carried out for the fault f3, and the stability analysis and study results of the wedge formed by combination of the fault f3 and the relaxed fissures.
出处 《云南水力发电》 2000年第1期17-21,共5页 Yunnan Water Power
基金 国家"九五"科技攻关项目!子题编号96-221-05-04-02
关键词 小湾电站 软弱夹层 水电站 进水口 边坡稳定性 Xiaowan Hydropower Project instability pattern soft seam wedge failure upper limit theorem.
  • 相关文献

参考文献3

  • 1王玉杰.边坡稳定分析的三维机动位移法,硕士论文[M].中国水利水电科学研究院,1998..
  • 2陈祖煜 汪小刚.岩石高边坡的失稳机理和分析方法.岩石高边坡的变形与稳定(第七章)[M].中国水利水电出版社,1999..
  • 3潘家睁.建筑物的抗滑稳定和滑坡分析[M].水利出版社,1980,6..

同被引文献6

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部