本文着重讨论不确定条件下的应急问题 ,当从出救点到应急地点时间为区间数时 ,给出了“使得应急开始时间不迟于限制期 t的可能度最大的方案”
Multi depot emergency problem on the bases of uncertainty is specifically discussed in this paper. We consider the problem of finding an optimal scheme which makes the possibility of earliest emergency start time meeting the deadline t maximum. Finally,the corresponding algorithm is derived.