摘要
本文对重庆黄桷渡水厂设计的全过程,作了较为系统的介绍,对设计中有关厂址选择、取水口选择、设计原则、工艺流程的选取、净水厂平面布置等有关问题,均作了较为详细的阐述,同时也指出了不足之处,以供今后设计借鉴。
This paper mainly illustrates the general design course of Huang-Jue-Du Waterworks in Chong-Qing. The complexity of the topographical and geological conditions of the site has induced the difficulties of design works. This paper emphasises considerations on the determination of design principles and treatment processes, selection of construction types, and the plan and elevation arrangement etc. The objective of this summary is to provide a reference for other similar projects.
出处
《中国给水排水》
CAS
CSCD
北大核心
1990年第2期26-29,共4页
China Water & Wastewater