摘要 海上风机吊装作业船是建设海上风电场的关键设备.为适应江苏地区海上风电场建设的需要,针对江苏沿海潮间带及沿海区域海上风电场风电机组安装作业要求,进行了海上风机吊装与运输专用作业船设计.所完成的86.7 m自航自升式海上风机吊装与运输专用作业船属海上风电场建设第3代吊装工作平台,具备自航、自升、运输、起重等复合功能,可完成水深25 m以下的海上风机运输、安装和海上风电场维护等作业任务. Offshore wind turbine installation vessel is key equipment for building offshore wind power station. In order to meet the developing demand of offshore wind power operations in Jiangsu province, and to satisfy the re- quirements of coastal intertidal and coastal areas offshore wind power station, offshore wind turbine installation vessel for lifting and transporting offshore wind turbine is designed. The length of self-propelled and self-elevating special workship for offshore wind turbine lifting and transport is 86.7 m, belonging to the third generation of lift- ing work platform for offshore wind power station construction. It can fulfill transportation, installation, mainte- nance of offshore wind turbine and other operations tasks below the water depth of 25 m wind power station.
出处 《江苏科技大学学报(自然科学版)》 CAS 北大核心 2011年第6期520-523,共4页 Journal of Jiangsu University of Science and Technology:Natural Science Edition
基金 江苏省科技支撑计划资助项目(BE2009118)
关键词 海上风电 吊装与运输作业 船舶设计 offshore wind power lifting and transporting offshore wind turbine ship design
  • 相关文献

参考文献8

二级参考文献43

  • 1战培国,于虹,侯波.海上风力发电技术综述[J].电力设备,2005,6(12):42-44. 被引量:19
  • 2江波.海上风电场施工方法初探[J].太阳能,2007(4):34-36. 被引量:6
  • 3张蓓文.海上风电场设备吊装[J].上海电力,2007,20(2):140-143. 被引量:24
  • 4Lars Nedergaard. Taking Windpower Offshore-Transport, Installation and Service Support of Offshore wind turbines[EB/OL], http://www.a2sea.com, 2008-4.
  • 5Gerhard Gerdes Albrecht Tiedeman drs. Sjoerd Zeelenberg. Case Study: European Offshore Wind Farms- A Survey for the Analysis of the Experiences and Lessons Learnt by Developers of Offshore Wind Farms -Final Report [R/OL]. http://theses.lub.lu.se/archive, 2006.
  • 6Gusto MSC. Jacking system fog'Resolution" [EB/OL]. http://GustoMSC.com, 2009-1.
  • 7Schutz, W, Schroter, E Development of heavy steel plate for Mayflower Resolution, special purpose vessel for erection of off shore wind towers[J]. Materials Science and Technology. 2005, 21 (5):590-596.
  • 8Wtm de Boom. Promising Offshore Assembling, Transport and Installation Techniques [EB/OL]. http://www. GustoMSC. com, 2009-1.
  • 9INSTALLATION EQUIPMENT FOR OFFSHORE WIND TURBINES[R]. GustoMSC.
  • 10ewea-Offshore_Report-2009 [ R ].

共引文献56

同被引文献12

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部