Grid Activities in Morocco
Grid Activities in Morocco
出处
《通讯和计算机(中英文版)》
2011年第10期813-818,共6页
Journal of Communication and Computer
参考文献22
-
1The Large Hadron Collider Project at CERN, available online at: http://lhc.web.cern.ch.
-
2EUMEDGRID: Empowering E-Sciences Across the Mediterranean, available online at: http://www.eumedgrid.org/.
-
3ATLAS, available online at:http ://atlas. web. cem.ch/Atlas/index, html.
-
4K.A. Assamagan, Final report of the ATLAS AOD/ESD Definition Task Force, ATL-SOFT-2004-006, 2004.
-
5GANGA, available online at: http://ganga.web.cern.ch/ganga.
-
6Available online at: https://goc.gridops.org/site/list?id=1755012.
-
7ATLAS Computing Technical Design Report, available online at: http:// cdsweb.cern.ch/record/837738/files/lhcc-2005-022.pdf.
-
8C.E. Amrani, O. Bouhali, Building up a Grid Computing at Abdelmalek Essaadi University, IEEE Morocco Section Workshop on Wireless Telecom and Information Systems, USMBA, Fez, Morocco, 2006.
-
9C.E. Amrani, O. Bouhali, Improving research productivity with grid computing, IEEE Morocco Section E-Week'06, 1NPT, Rabat, Morocco, 2006.
-
10UAEGrid, available online at: http://www.uae.ma/uaegrid/.
-
1JARAR OULIDI Hassane,LWNER Ralf,BENAABIDATE Lahcen,WCHTER Joachim.HydrIS: An Open Source GIS Decision Support System for Groundwater Management (Morocco)[J].Geo-Spatial Information Science,2009,12(3):212-216. 被引量:1
-
2地中海地区将耗资10亿美元建设世界上最大的多国互联电力系统[J].国际电力,2004,8(4):36-36.
-
3Diane Pruneau,Boutaina E1 Jai,Joanne Langis.Using Design Thinking and Facebook to Accompany Women in Solving Water Problems in Morocco[J].Journalism and Mass Communication,2016,6(9):555-564.
-
4爱立信在意大利创建云实验室促进协同创新[J].电信网技术,2015(6):96-96.
-
5Bruno Morandi-Dragonimage.北非花园摩洛哥 置身于阳光和阴影之下[J].旅游,2009(11):22-27.
-
6研究表明太阳能发电潜力很大[J].中外能源,2014,19(9):101-101.
-
7李毅.俄罗斯原子能出口公司准备为摩洛哥建设第一座核电厂[J].国外核新闻,2007(6):22-22.
-
8摩洛哥——西班牙签订海底电缆互连协定[J].中国电力,2004,37(8):67-67.
-
9摩洛哥——西班牙签订海底电缆互连协定[J].中国电力,2004,37(8):88-88.
-
10非洲最大风力发电厂投入使用[J].设备监理,2015(1):64-64.