摘要
防护工程中空调系统的冷却塔一般设置在工程口部之外,这就导致冷却水管道较长、系统运行不稳定,冷却塔缺乏伪装和防护,有时冷凝器承受的压力过大等问题。笔者在某防护工程设计中,将冷却塔的位置移至工程内部空调机房附近并对冷却塔进行适当改进,利用工程主体排风作为冷却塔冷风源的一部分。几年的实际运行表明效果良好并解决了上述问题。
At present, the cooling tower of air conditioning system is usually designed to be located outside the gate-way of protective engineering, which causes a series of problems such as longer cooling water tube, unstabilization of system operation, lack of camouflage and pretection for cooling tower and too much pressure on the cooler. In the design of a certain protective engineering, the cooling tower of air conditioning system is moved to somewhere near the air conditioner room inside, and the cooling tower is modified properly, exhausting air of the engineering is used as a part of cooling wind for the cooling tower. It has been proved to be effective by the practice in these years. All the problems mentioned above have been solved.
出处
《防护工程》
2012年第1期64-67,共4页
Protective Engineering
关键词
防护工程
空调系统
冷却塔
位置
protective engineering
air conditioning system
cooling tower
location