摘要
介绍盐田港二期码头桩内锚定施工技术。比较多根锚杆的最小锚固长度 ;
The technique to build anchorage system inside pipe piles at the Second Phase of Yantian Port is given in the paper.Comparisons are made to the minimum anchorage length of multi number anchor rods and comparisons are also made between the anchorage inside piles rooted in rock bed and anchorage inside non rock rooted piles.
出处
《中国港湾建设》
2000年第1期31-35,共5页
China Harbour Engineering