摘要
本文简要介绍水上挤密砂桩施工工艺和现场检测情况 :包括选择施工设备、确定施工参数、砂桩检测结果。
The paper presents an elementary introduction to the technique of installation of sand compaction piles on the water and the results of field observation and tests, including the selection of machinery and plant for the piles, determination of installation parameters, and results of tests on the sand compaction piles.
出处
《中国港湾建设》
2000年第1期36-41,共6页
China Harbour Engineering
关键词
水上挤密砂桩
施工
参数
中心平均标贯值
Sand compaction pile on the water
installation parameter
average value of SPT at center
testing