摘要
要关注在火电厂设计工作中,应加强对新工艺设备如正压气力除灰系统和烟气脱硫系统的粉尘产污环节的分析,并制定提出符合实际、并且有效的环保措施。加强在灰库处、输煤系统扬尘点较多,扬尘范围大,粉尘浓度超标的地方,采取相应的除尘措施。
In paying attention to the thermal power plant design, it is necessary to strengthen the analyzing to the new process equipment dust pollution link such as pneumatic ash disposal system with positive pressure system and flue gas desulphurization system and to formulate practical and effective environment protection measures. In the place of dust bank, coal handling system, flying dust - forming points and dust concentration over - standard, it is necessary to adopt relevant dust removal measures.
出处
《贵州电力技术》
2012年第1期55-57,共3页
Guizhou Electric Power Technology
关键词
火电厂
粉尘
污染
防治
措施
thermal power plant
dust
pollution
preventing
measure