摘要
结合广珠铁路虎跳门特大桥 2 0 0 m连续刚构桥设计介绍了整体结构分析中采用的
On the basis of the design of 200\|m prestressed concrete continuous rigid\|frame span of Hutiaomen Bridge on Gangzhou\|Zhuhai Railway Line,three kinds of equivalent analog calculation methods for pile foundations used in analysis of full structure are introduced.
出处
《桥梁建设》
EI
CSCD
北大核心
2000年第1期69-71,共3页
Bridge Construction
关键词
连续刚构桥
桩基
计算方法
铁路桥
模拟
continuous rigid frame bridge,pile foundation,calculation method