以里耶110kV变电站工程某一边坡为例,从边坡的稳定性评价、钢筋混凝土锚喷支护(锚索与锚杆组合)加固设计和经济性等多方面介绍了钢筋混凝土锚喷支护在变电站高边坡组合加固设计中的应用情况,以此论证钢筋混凝土锚喷支护加固岩质高边坡的组合方法的优点和实效性。
Taking a slope of the Liye 110kV substation project for example,the application of reinforced concrete bolting and shotcreting in composite reinforcement design of a substation high slope was introduced in terms of slope stability evaluation,the reinforcement design and the economy of reinforced concrete bolting and shotcreting(combination of anchor cableand anchor bolt),and it demonstrated the advantages and effectiveness of application of reinforced concrete bolting shotcreting in the composite reinforcement of the high rock slope.