期刊文献+

钢筋混凝土锚喷支护在变电站高边坡工程中的应用 被引量:2

Application of reinforced concrete bolting and shotcreting in high slope project of a substation
下载PDF
导出
摘要 以里耶110kV变电站工程某一边坡为例,从边坡的稳定性评价、钢筋混凝土锚喷支护(锚索与锚杆组合)加固设计和经济性等多方面介绍了钢筋混凝土锚喷支护在变电站高边坡组合加固设计中的应用情况,以此论证钢筋混凝土锚喷支护加固岩质高边坡的组合方法的优点和实效性。 Taking a slope of the Liye 110kV substation project for example,the application of reinforced concrete bolting and shotcreting in composite reinforcement design of a substation high slope was introduced in terms of slope stability evaluation,the reinforcement design and the economy of reinforced concrete bolting and shotcreting(combination of anchor cableand anchor bolt),and it demonstrated the advantages and effectiveness of application of reinforced concrete bolting shotcreting in the composite reinforcement of the high rock slope.
作者 徐满华
出处 《工程建设》 2012年第1期32-35,42,共5页 Engineering Construction
关键词 钢筋混凝土锚喷支护 预应力锚索 高边坡 加固 reinforced concrete bolting and shotcreting prestressed anchor cable high slope reinforcement
  • 相关文献

参考文献2

  • 1DL/T5176-2003,水电工程预应力锚固设计规范[S].
  • 2GB50007-2002.建筑地基基础设计规范[S].[S].,..

共引文献1812

同被引文献14

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部