期刊文献+

安钢订单拉动式生产的管理与优化

MANAGEMENT AND OPTIMIZATION ON PULLING PRODUCTION IN ANYANG STEEL
下载PDF
导出
摘要 结合钢铁企业面向订单的拉动式生产特点,介绍了安钢为了适应市场竞争形势,以满足客户个性化需求为核心,按订单组织生产以及计划管理的特点,并从一体化管理的角度对拉动式生产模式进行了优化和改进,提高了生产过程的管控水平,使企业产销模式更加适应市场变化节奏,产销服务水平得到进一步增强。 The characteristics of organizing production and plan management based on order are introduced for Anyang Steel to adapt market competition and meet customer' s requirements in iron and steel industry. Pulling reduction mode is optimized and improved from integrated management, which raises the management and control level of process and enhances production and sale service level.
出处 《河南冶金》 2012年第1期15-17,共3页 Henan Metallurgy
关键词 订单 拉动式生产 优化 order pulling production optimizing
  • 相关文献

参考文献3

二级参考文献23

  • 1唐立新,自动化学报,1998年,24卷,1期
  • 2唐立新,钢铁,1996年,31卷,11期,28页
  • 3Nagalingam S V, Lin G C I. Latest developments in CIM [J]. Robotics and Computer Integrated Manufacturing, 1999, 15: 423-430.
  • 4Vassell C. Computer integrated manufacturing, and small and medium enterprise [J]. Computer & Industrial Engineering, 1999, 37: 425-428.
  • 5上野哲郎. 战略经营と经营情报システム[J]. オペレ-シヨンズ.リサ-チ,1990, 35(12): 652-655.
  • 6浅野茂など. 铁钢业におけるCIM构筑の现状とシステムニ-ズ[J]. 计装,1989, 32(11): 10-14.
  • 7桥本彰など. 贩壳、生产、物流システム概要[J]. 川崎制铁技报,1988, 20(2):95-101.
  • 8Katsuma Yoshida,Tomohik Kimura,Tadao Watanabe,et al.Hot charge rolling process at smikashima No.3 caster[J]. Iron and Steel,1988,74(7):1240-1247.
  • 9加藤健三. 连铸から热延への直结化にして思う[J]. 铁と钢,1988,74(7):1199-1202.
  • 10O.ara.The integrated production planning and scheduling system in Kashima steel works[A].Proceeding of IBM International Steel & Metals Conference[C].Belgium: IBM International Education Center,1995.

共引文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部