充填采煤固体物料垂直投料井施工工艺研究 被引量:15

Key Construction Technology of Vertical Feeding Bore Hole for Solid Materials in Backfilling Coal Mining
原文传递
导出
摘要 为了提高充填采煤固体物料垂直投料井施工速度及成孔质量,基于固体物料垂直投料井结构特征,分析了投料井成井技术难点,并研究了投料孔施工、投料管安装,以及投料孔测斜等一整套施工工艺。结果表明,采用多级钻进扩孔、浮板法下管和多种测斜相结合的工艺可确保投料井施工质量。该工艺在我国某煤矿进行了应用,投料井钻进速度达6 m/d,垂直度为1‰。 To increase the construction speed and hole quality of vertical feeding bore hole for solid materials in backfilling coal mining,based on analyzing the structure characteristcis of vertical feeding system,we analyzed the technological difficulties in drilling of vertical feeding system,and studied a set of construction techniques including the job practice,the pipeline installation,the method of inclination surveyor,et al.The results show that when using the technology which covers multistage drilling and chambering method,heavy crane or frame crane and float panel sinking method,and a variety of lateral deformation methods,the construction quality of vertical feeding system can be guaranteed.The technology has been successfully applied to a coal mine in China,while the bore hole driving speed can be reached to about 6 m/d,and the verticality is 1‰.
出处 《采矿与安全工程学报》 EI 北大核心 2012年第1期38-43,共6页 Journal of Mining & Safety Engineering
基金 国家自然科学基金项目(51074165) 国家自然科学基金重点项目(50834004)
关键词 综合机械化固体充填采煤 投料井施工 成孔 fully mechanized backfilling coal mining with solid material construction technology of vertical feeding bore bore hole performing
  • 相关文献

参考文献12

二级参考文献35

共引文献530

同被引文献125

引证文献15

二级引证文献116

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部