摘要
以某棒线厂房主轧一跨为例,详细讲述了抽柱排架吊车荷载的计算,抽柱排架单元的划分和如何展开计算等,使大家对PKPM中吊车荷载中抽柱排架的输入有了清楚的认识。
Taking the main rolling span Ⅰ of the coil workshop as an example,the essay specifically expounds the calculation of demolishing column frame crane load,how to calculate and divide the demolishing column frame and so on,so as to clearly understand the input of demolishing column frame of crane load into PKPM.
出处
《山西建筑》
2012年第10期41-42,共2页
Shanxi Architecture
关键词
抽柱
屋盖
吊车荷载
demolishing column
roof