摘要
介绍了天津地铁3号线中山路站—北站区间小半径曲线段钢弹簧浮置板道床"拼装一体化"(钢筋笼轨排法)施工中质量控制要点。针对施工过程中遇到的难点进行了分析并提出解决方法,对今后同类项目施工具有指导意义。
The paper introduces the quality control points for the assembly integration,which is called the steel reinforcement cage track panel,of steel spring floating slab track bed at the small radius curve section between Zhongshan Road Station-Beizhan Area of No.3 Subway in Tianjin,analyzes the difficulties in the construction process and points out the solution methods,so as to have the direction significance for the similar programs in future.
出处
《山西建筑》
2012年第10期167-168,共2页
Shanxi Architecture
关键词
钢弹簧浮置板道床
质量控制
钢筋笼轨排
轨道几何尺寸调整
steel spring floating slab track bed
quality control
steel reinforcement cage track panel
geometric dimension adjustment of rail