茂名石化炼油废水处理扩建一期工程A/O系统改O/O工艺运行探索 被引量:8

RESEARCH ON PROCESS OPERATION AFTER CONVERSION OF A/O SYSTEM TO O/O OF REFORMING AND ENLARGING PROJECT OF PHASE Ⅰ FOR WASTEWATER TREATMENT OF OIL REFINERY UNDER MAO MING PETROCHEMICAL COMPANY
下载PDF
导出
摘要 茂名石化炼油废水A/O系统改O/O工艺运行后,出水水质各项指标均达到国标和地标排放。为期两个月的工业试运行,为工艺操作与管理提供了经验和依据,同时也为二期工程的设计、施工和管理奠定了基础。 All the indexes of the water quality of the effluent can meet the national and local emission standards after the conversion of A/O system to O/O process of wastewater treatment of the oil refinery under Mao Ming Petrochemical Company. The experience in the process operation & management is given by two months' industrial commissioning,which has laid a foundation for the design,construction and management of the project of phase Ⅱ.
出处 《环境工程》 CAS CSCD 北大核心 2000年第1期21-23,共3页 Environmental Engineering
关键词 炼油 工艺改造 废水处理 oil refining wastewater,process reform and engineering result
  • 相关文献

参考文献2

二级参考文献1

共引文献13

同被引文献37

引证文献8

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部