摘要
茂名石化炼油废水A/O系统改O/O工艺运行后,出水水质各项指标均达到国标和地标排放。为期两个月的工业试运行,为工艺操作与管理提供了经验和依据,同时也为二期工程的设计、施工和管理奠定了基础。
All the indexes of the water quality of the effluent can meet the national and local emission standards after the conversion of A/O system to O/O process of wastewater treatment of the oil refinery under Mao Ming Petrochemical Company. The experience in the process operation & management is given by two months' industrial commissioning,which has laid a foundation for the design,construction and management of the project of phase Ⅱ.
出处
《环境工程》
CAS
CSCD
北大核心
2000年第1期21-23,共3页
Environmental Engineering
关键词
炼油
工艺改造
废水处理
oil refining wastewater,process reform and engineering result