摘要
向家坝水电站是金沙江下游梯级电站开发的最后一级水电站,坝址位于四川省宜宾县与云南省水富县交界的峡谷出口处。向家坝水电站开发任务以发电为主,同时改善上、下游通航条件,兼顾灌溉,结合防洪、拦沙,并且具有对上游梯级电站进行反调节等综合作用。
Xiangjiaba planning to installed capacity is 6400MW,average annual energy output up to 30.747 billion kWh,could irrigated 250000 hm2.Xiangjiaba construction was begin in 2006 and at a crucial period now,construction equipments play an important role in the project.We are convinced that generating electricity in October 2012 and be up to 384m fronts in January 2013 will be achieved for the constructors' hard work.Greeting to them.
出处
《建筑机械化》
2012年第3期22-27,7,共6页
Construction Mechanization