介绍了西铭矿选煤厂工艺运行调试的内容,包括单机空载与联合空载的试运转及调试,带水、带介、带煤联合试运转及调试,煤泥水系统的调试等。
This paper introduces the contents of the process operation debugging in Ximing Coal Mine' s Coal Washing Plant, including the single no-load and joint no-load test running and debugging, the joint test running and debugging with water, medium and coal, and the debugging of slurry system, etc.