摘要
从实践出发,对太原市玉门河公园景观绿化工程和太原市迎宾路绿化工程进行了分析总结,介绍了从栽植前的准备工作、栽植具体方法以及栽植后的养护管理等一系列反季节移栽技术,重点阐述了在移植苗数量多的情况下所采用的"流水线"作业技术。
Starting from the practice, this paper sums up and analyzes the Yumenhe Park landscape engineering and Yingbin Road landscape engineering of Taiyuan City, introduces a series of out-of-season transplant techniques including the preparatory work before transplant, the concrete method of transplant and the maintenance and management after transplant, and emphatically expounds the line operation technique adopted in the case that the number of transplanted seedlings is more.
出处
《科技情报开发与经济》
2012年第4期131-133,共3页
Sci-Tech Information Development & Economy