期刊文献+

加工时间不确定的船体分段空间调度方法 被引量:1

Uncertain processing time based hull block spatial scheduling in shipbuilding
下载PDF
导出
摘要 针对调度过程中存在的不确定性因素及调度对象存在关联约束关系,提出了一种加工时间不确定的船体分段空间调度方法.以旁板这一类分段关联件的加工时间的变动作为不确定影响因子,建立了船体分段在不确定环境下的空间调度模型,目标为最小化由不确定因素造成分段提前、拖期的时空占用成本.该模型考虑了船厂实际生产过程中的随机加工时间以及分段和关联件的约束关系,结合某船厂的实际生产数据进行实例验证,结果表明,该模型能对加工时间不确定条件下的船体分段空间调度给出较优的调度解,而且在空间调度解的质量和模型应用范围等方面更贴近船厂现实生产情况. This paper presented a new mathematical model to solve the hull block spatial scheduling problem including uncertain processing time in shipbuilding. This model mainly considered affection made by block relative comoonents which depended on the attitude of the decision maker towards uncertainty in such a way that the optimalscheduling in shipbuilding can be changed significantly, Tne objecuve was ness and tardiness time-space occupation. Finally, a number of instances were optimally simulated to validate and verify the proposed model. The results show that this model performs well and can give different answers to various producing environment in shipbuilding.
出处 《哈尔滨工程大学学报》 EI CAS CSCD 北大核心 2012年第2期214-220,共7页 Journal of Harbin Engineering University
基金 国家自然科学基金资助项目(70872076) 上海科技创新行动计划资助项目(11dz1121803)
关键词 船体分段 空间调度 不确定加工时间 关联约束 时空占用成本 hull block spatial scheduling uncertain processing time relative constraints time-space occupied costs
  • 相关文献

参考文献15

二级参考文献73

  • 1李波,王秀峰,赵志彦.一种基于遗传算法的最优空间布置方法[J].系统仿真学报,2004,16(8):1845-1848. 被引量:6
  • 2徐震浩,顾幸生.不确定条件下具有零等待的流水车间免疫调度算法[J].计算机集成制造系统,2004,10(10):1247-1251. 被引量:21
  • 3郭美娜,李波.基于树搜索的一种动态空间调度方法[J].计算机工程与应用,2007,43(14):180-183. 被引量:11
  • 4满春涛,孙明辉,张礼勇.粒子群优化算法在多峰函数寻优上的应用[J].哈尔滨理工大学学报,2007,12(2):11-13. 被引量:6
  • 5Park C, Chung K H, Park J C, etal. A spatial scheduling application at the block paint shop in shipbuilding:The HYPOS project[J]. Production Planning & Control, 2002, 13(4) :342-354.
  • 6Sung C S, Choung Y I. Minimizing makespan on a single burn-in oven in semiconductor manufacturing[J]. European Journal of Operational Research, 2000, 120 : 559 -574.
  • 7Park K, Lee K, Park S, et al. Modeling and solving the spatial block scheduling problem in a shipbuildingcompany[J]. Computer ind Engng, 1996, 30 (3): 357- 364.
  • 8Li B, Zhao Y Z, Li J D. A hybrid algorithm for nesting problems[C]//Proceedings of the Second Interna- tional Conference on Machine Learning and Cybernetics. Xi'an: IEEE, 2003: 1424-1429.
  • 9JooM H, Choi H R, Ryu K R, etal. A curve block assembly schedule in shipbuildings using constraint relaxation method[C]//Proeeedings of the Fall 98 Conference of the KESS. Korean: Korean Expert System Society, 1998: 285-292.
  • 10Koh S G, Park J C, Choi Y S, etal. Development of a block assembly scheduling system for shipbuilding company[J]. IE Interfaces, 1999, 12(4): 586-594.

共引文献59

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部