3RICHARD R. Industrialised building systems : Reproduction before automation and robotics [J]. Automation in Construction, 2005 (14) :442 -451.
4GIBB A, ISACK F. Re-engineering through pre-assembly: Client expectations and drivers [J]. Building Research & Information, 2003,31 (2) :146 - 160.
5宋健.新型建筑工业化:建筑业转型发展的大机遇[J].中国建设报,2014(2):5-6.
6ARIF M, EGBU C. Making a case for offsite construction in China [J]. Engineering, Construction and Architectural Management, 2010,17 (6) :536 -548.
7PAN W, SIDWELL R. Demystifying the cost barriers to offsite construction in the UK [J]. Construction Management and Economics, 2011,11 (29) : 1081 - 1099.
8MAO C, et al. Major barriers to off-site construction: The developer' s perspective in China [ J ]. Journal of Management in Engineering,2015 (2) :04014043 - 1 - 8 DOI : 10. 1061/(ASCE) ME. 1943 - 5479. 0000246.
9JAILLON L, POON C. Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study [ J]. Construction Management and Economics ,2008,26:953 - 966.
10MAO C, et al. Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: Two case studies of residential projects[ J]. Energy and Buildings,2013,66:165 -176.