三峡永久船闸混凝土边墙极端不利外水压力分析 被引量:3

ANALYSIS ON THE EXTREME UNFAVORABLE EXTERNAL WATER PRESSURE ON PERMANENT SHIPLOCK SIDE WALLS OF THREE GORGES PROJECT
下载PDF
导出
摘要 三峡永久船闸采用直立岩坡贴壁式薄衬砌边墙,墙后外水压力是边墙稳定的重要荷载。船闸闸室水位变动频繁,当闸室水位突降,由室内渗出的外水即构成作用在边墙上的外水压力。考虑了墙内排水体系的作用,对非恒定渗流问题进行了多工况分析,给出极端最大外水压力值。 The thin concrete lining on vertical rock slope is adopted as the sidewalls of permanent shiplock of Three Gorges Project. The external water pressure acting on lining is an important load for stability of the side walls. Water level in shiplock is always fluctuated. The external water pressure is induced by water seepage into rock mass while water level in shiplock is sharply dropping down. The extreme un favorable seepage water pressure is given by unsteady seepage analysis in consideration of drainage system behind the sidewalls.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2000年第2期186-192,共7页 Chinese Journal of Rock Mechanics and Engineering
基金 长江三峡开发总公司 国家自然科学基金!(59493600)
关键词 外水压力 渗流场 排水体系 船闸 混凝土边墙 external water pressure, seepage field, drainage system
  • 相关文献

参考文献3

二级参考文献2

  • 1张有天,Computer Methods and Advances in Geomechanies,1994年,1306页
  • 2孙广忠,中国典型滑坡,1988年

共引文献65

同被引文献20

引证文献3

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部