州河特大桥合龙方案改变可行性分析研究 被引量:4

Analysis of Closure Scheme Change for Zhou River Bridge
下载PDF
导出
摘要 连续刚构桥合龙方案的选择决定了桥梁结构的内力及线形,州河大桥为满足施工工期的要求,在原有设计基础上,改变合龙顺序,对比分析得出合龙过程最佳顶推力,同时,对运营3年后成桥结构是否满足设计要求进行验算.结果表明:在合理顶推力作用下,施工过程中对结构预拱度值进行局部调整能够准确满足在施工及成桥状态下线形及应力设计要求,为类似桥梁施工提供一定的借鉴. The different closure program of continuous rigid frame bridge determines the structure's internal force and linear.To meet the requirements of the construction period for Zhou River Bridge,the closure program has been changed.The original closure program is analysed to contrast to the last closure program for figuring out the best jacking force.At the same time,the bridge after operation for three years has been analysed to check the carrying capacity.The result showed that partial adjustment of pre-camber of bridge in construction period can accurately satisfy linear and stress design requirements in construction and bridge under the reasonable horizontal jacking force.It's providing a reference for a similar bridge construction.
出处 《兰州交通大学学报》 CAS 2012年第1期23-28,共6页 Journal of Lanzhou Jiaotong University
关键词 合龙方案 前进分析法 施工阶段分析 预应力混凝土连续刚构桥 closure program overviewed forward process analysis construction stage analysis PSC continuous rigid frame bridge
  • 相关文献

参考文献3

  • 1张治成,叶贵如,陈衡治,徐兴.大跨度桥梁施工控制结构分析计算方法[J].浙江大学学报(工学版),2004,38(2):210-214. 被引量:31
  • 2中华人民共和国交通部.JTG D62-2004公路钢筋混凝土及预应力混凝土桥涵设计规范[S].北京:人民交通出版社,2004..
  • 3刘世忠.桥梁施工[M].北京:中国铁道出版社,2011.

二级参考文献2

共引文献51

同被引文献38

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部