摘要
库什塔依水电站工程面临着工期紧、任务重、沥青混凝土冬季施工等问题,给现场的施工管理带来了挑战。在建设过程中严格执行中电投新疆公司管理制度,通过建立健全质量保证体系,完善质量保证措施,强化参建各方的质量责任意识,加强过程监控,实现了工程建设的质量目标。
As the tight schedule, heavy task and special asphalt concrete pouring in winter in the construction of Kushitayi Hydropower Station, the site construction management faces a challenge. The management system of China Power Investment Xinjiang Company is strictly implemented in project construction. Through establishing a sound quality assurance system, improving quality assurance measures, strengthening quality responsibility awareness of all parties participating in the construction and enhancing process monitor, the targets of project quality are achieved.
出处
《水力发电》
北大核心
2012年第4期56-58,共3页
Water Power
关键词
质量管理
工程建设
库什塔依水电站
quality management
project construction
Kushitayi Hydropower Station