库什塔依水电站电气主接线设计 被引量:2

Design of Main Electric Connection for Kushitayi Hydropower Station
下载PDF
导出
摘要 库什塔依水电站作为流域梯级水电站的汇流站,涉及不同的电压等级,其接线方式对电力系统稳定和安全运行有较大影响。根据电站自身条件,库什塔依水电站发电机和主变压器采用两组扩大单元接线,220 kV出线侧采用单母线分段接线。还介绍了电站两级电压之间的联络以及厂用电电源的接线方案。 Kushitayi Hydropower Station is taken as a power collection of cascade hydropower stations which involves different voltage levels. The main electric connection has greater impact on the safe and stable operation of power system. According to the actual conditions, the generators and main transformers in Kushitayi Hydroelectric Station are connected by two expand units, and the 220 kV busbar is a switchable single-bus system. The connections of busbars with different voltage level and auxiliary power supply are also introduced herein.
作者 俞永辉
出处 《水力发电》 北大核心 2012年第4期59-61,共3页 Water Power
关键词 电气主接线 扩大单元接线 单母线分段接线 厂用电 库什塔依水电站 main electric connection expanded unit connection switchable single-bus connection auxiliary power supply Kushitayi Hy&opower Station
  • 相关文献

参考文献5

  • 1SDJ173-85,水力发电厂机电设计技术规范[S].
  • 2DL/T5164-2002水力发电厂厂用电没计规程[S].
  • 3阮全荣.大型水电站电气主接设计研究.水电电气,2000,141(3):4-9.
  • 4李定中.我国水电开发与机电设备现状及未来课题.水电电气,2002,123(1):11-14.
  • 5水利水电电气信息网.水电站电气主接线图册[M].北京:中国水利电力出版社,2004.