考虑电动汽车换电站与电网互动的机组组合问题研究 被引量:51

Research on Unit Commitment Considering Interaction Between Battery Swapping Station and Power Grid
下载PDF
导出
摘要 大规模电动汽车换电站接入电网后,其充放电行为将给系统优化运行带来新的挑战。将电动汽车换电站引入传统机组组合问题中,提出考虑换电站与电网互动的机组组合(unit commitment,UC)新模型。在深入研究电动汽车电池更换物理过程的基础上,以常规机组的发电成本、启动成本和考虑换电站充放电净负荷的方差为目标函数,考虑了换电站的充放电效率、电量平衡和满足日换电需求的最小储能等约束,形成机组组合问题优化新模型。通过换电站充、放电过程优化,降低机组出力的调整频率,提高电网安全运行的经济性。最后,在10机电力系统模型上进行算例仿真分析,验证所提模型的有效性和正确性。 Large-scale integration of battery swapping station (BSS) into power system would bring extensive impacts on power system operation. In this paper, BSS of electric vehicles (EV) was taken account into basic unit commitment, thus a new unit commitment model considering BSS with charging/discharging was proposed for the first time. Based on the research on physical process of battery replacement, the objective was developed with production cost and startup cost of thermal generations, variance function of total load with BSS charging/discharging power. Also it subjected to many constraints including power balance with charging/discharging efficiency, energy storage limits and the minimum storage energy for battery replacement demand. Through the optimization of unit commitment (UC) considering interaction between BSS and power grid, the operation cost of power system is reduced a lot. Furthermore, variance optimization in objective improves the adjustment of unit output efficiently. Finally, the effectiveness and validity of proposed model are illustrated by 10-unit system.
出处 《中国电机工程学报》 EI CSCD 北大核心 2012年第10期49-55,49-55,共7页 Proceedings of the CSEE
基金 国家863高技术基金项目(2011AA05A110) 国家自然科学基金项目(51107060) 国家电网公司科技项目~~
关键词 机组组合 电动汽车 换电池站 电动汽车与电网互动 unit commitment (UC) electric vehicle (EV) battery swapping station vehicle-to-grid (V2G)
  • 相关文献

参考文献22

  • 1Song Y H,Yang X,Lu Z X.Integration of plug-in hybrid and electric vehicles:experience from China[C]//Proceedings of IEEE Power Engineering Society General Meeting.Minneapolis,Minnesota,USA:IEEE Power&Energy Society,2010:1-6.
  • 2Goldman School of Public Policy(GSPP)Client-Based Policy Consulting Program,University of California-Berkeley.PACS-L:bay area electrified vehicle charging infrastructure,options for accelerating consumer access[EB/OL].(2010-06-01)[2011-5-31].http://rael.berkeley.edu/sites/default/files/Final%20Paper%20Bay%20Area%20Electrified%20Vehicle%20Charging%20Infrastructure%20Options%20for%20Accelerating%20Consumer%20Access.pdf.
  • 3Greater London Authority’s Draft for Consultation.PACS-L:London’s electric vehicle infrastructure strategy turning London electric[EB/OL].(2009-12-01)[2011-05-31].http://www.nudgeadvisory.com/assets/uploaded/docs/49.pdf.
  • 4Roland Berger Strategy Consultants.PACS-L:the future drives electric[EB/OL].(2009-10-01)[2011-05-31].http://www.zvei-elektromobilitaet.org/general/ecartec/2009-10-13_Urbschat.pdf.
  • 5Christophe G,George G.A conceptual framework for the vehicle-to-grid(V2G)implementation[J].Energy Policy,2009,37(11):4370-4390.
  • 6Baldwin C J,Dale K M,Dittrich R F.A study of the economic shutdown of generating units in daily dispatch[J].IEEE Trans.on American Institute of Electrical Engineers,1959(78):1272-1284.
  • 7白晓民 于尔铿.用动态规划法进行电力系统机组组合最优化.中国电机工程学报,1984,4(1):11-19.
  • 8Li C A,Svoboda A J,Tseng C L,et al.Hydro unit commitment in hydro-thermal optimization[J].IEEE Trans.on Power Systems,1997,12(2):764.
  • 9吴宏宇,管晓宏,翟桥柱,高峰.水火电联合短期调度的混合整数规划方法[J].中国电机工程学报,2009,29(28):82-88. 被引量:52
  • 10Saber A Y,Venayagamoorthy G K.Unit commitment with vechicle-to-grid using particle swarm optimization[C]//Proceedings of IEEE Power Tech.Bucharest,Romania:IEEE Power&Energy Society,2009:1-8.

二级参考文献53

  • 1王宇宁,包凡彪,姚磊,刘超.电动汽车试点示范的风险及防范[J].汽车工业研究,2004(11):34-37. 被引量:5
  • 2郭三刚,管晓宏,翟桥柱.具有爬升约束机组组合的充分必要条件[J].中国电机工程学报,2005,25(24):14-19. 被引量:33
  • 3孙力勇,张焰,蒋传文.基于矩阵实数编码遗传算法求解大规模机组组合问题[J].中国电机工程学报,2006,26(2):82-87. 被引量:64
  • 4刘强,王春莉.市场环境下电动汽车的电力服务[J].电力需求侧管理,2007,9(1):45-47. 被引量:20
  • 5Chang G W, Aganagic M, Waight J G, et al. Experiences with mixed integer linear programming based approaches on short-term hydro scheduling[J]. IEEE Transactions on Power Systems, 2001, 16(4): 141-147.
  • 6ConejoAJ, Arroyo J M, Contreras J, et al. Self-scheduling of a hydro producer in a pool-based electricity market[J]. IEEE Transactions on Power Systems, 2002, 17(4): 1265-1272.
  • 7Prasannan B, Luh P B, Yan H, et al. Optimization-based sale transactions and hydrothermal scheduling[J]. IEEE Transactions on Power Systems, 1996, 11(2): 654-660.
  • 8Salam M S, Nor K M, Hamdan A R. Hydrothermal scheduling based Lagrangian relaxation approach to hydrothermal coordination [J]. IEEETransactions on Power Systems, 1998, 13(1): 226-235.
  • 9Guan X, Guo S, Zhai Q. The conditions for obtaining feasible solutions to security-constrained unit commitment problems[J]. IEEE Transactions on Power Systems, 2005, 20(4): 1746-1756.
  • 10Martinez-Crespo J, Usaola J, Fernandez J L. Security-constrained optimal generation scheduling in large-scale power systems[J]. IEEE Transactions on Power Systems, 2006, 21(1): 321-332.

共引文献1087

同被引文献742

引证文献51

二级引证文献1080

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部