摘要
介绍观音岩水电站施工期间取水系统的工程设计及施工。取水系统运行效果良好,结果表明:其工程设计是合理的,施工质量符合相关规范要求。
The engineering design and construction of water intake systems during the construction of Guanyinyan hydropower station are introduced. The practical effects indicate that water intake system is well - operated, the design is reasonable and construction quality is in conformity with the relevant standards.
出处
《水电与新能源》
2012年第2期20-21,共2页
Hydropower and New Energy
关键词
观音岩水电站
取水系统
设计
施工
Guanyinyan Hydropower Station
water intake system
design
construction