邯钢5号高炉中修后,对开炉前准备,开炉过程,以及快速达产的经验进行总结.
Since its intermediate relining in October 2010, the 5# BF of Han Steel has quickly reached its production quota; the article summarizes the experiences of the preparation and operation of restarting up the relined furnace.