摘要
某县污水厂采用奥贝尔氧化沟工艺,对工艺的运行情况进行了分析,通过混凝实验确定最佳投药量,投加絮凝剂,提高了出水效果,从而解决了出水不好的问题。
According to the adoption of the Orbal oxidation ditch in some wastewater treatment plant,the paper analyzes the operation circumstance of the craft,and solves the insufficient effluent problem by identification of the optimized volume from the experiments,the addition of the flocculant,and improvement of the effluent effect.
出处
《山西建筑》
2012年第11期126-127,共2页
Shanxi Architecture
关键词
奥贝尔氧化沟
去除率
污水处理
Orbal oxidation ditch
removal rate
sewage treatment