3Morin G,Fortin J P,Sochanska W,et al.Use of principal component analysis to identify homogeneous precipitation stations for optimal interpolation[].Water Resources.1979
4Galeati G,Rossi G,Pini G,et al.Optimization of a snow network by multivariate statistical analysis[].Hydrological Sciences Journal.1986
5Burn D H,Goulter I C.An approach to the rationalization of stream flow data collection networks[].Journal of Hydrodynamics.1991
6Timothy B,Spruill C,Lucila C.Two approaches to design of monitoring networks ground water[]..1990