期刊文献+

大安河金矿采用板框压滤机处理尾矿的生产实践 被引量:2

The operation practice to treat tailing by means of plate frame pressure filter in Da An He gold mine
下载PDF
导出
摘要 大安河金矿选矿排尾采用板框压滤干排设备后 ,选矿排尾形成了尾矿废水不外排循环利用的新工艺 ,使排尾成本大幅降低。由原来的 2 3 7万元 /a ,下降到现在的 84万元 /a,年多创效益达 1 70万元。此项技术改造 ,效益显著 ,值得同类岩金矿山借鉴。 After the dry tail removing equipment of plate frame pressure filter was employed to remove tail in Da An He Gold Mine,the waste water from tailing didnot outflow again,forming circulatary utilization,thus the cost of tail removing decreased greatly from RMB $2.37 mllions to $0.84million,and the economic benefit reached annually $1.7 million.This technical remoulding has gained marked benefit which is worthy to ba used for reference for the same kind gold mine.
作者 李娟 律清阳
出处 《黄金》 CAS 北大核心 2000年第3期40-42,共3页 Gold
关键词 排尾工艺 板框压滤机 金矿 尾矿处理 dry tail removing equipment of plate frame pressre filter tail waste water expenditure technology of tail removing
  • 相关文献

同被引文献83

引证文献2

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部