关于地埋管换热器施工工艺及质量监控要点的探讨 被引量:1

Discussion on construction technique of ground heat exchanger with buried pipes and key points of the quality supervision
下载PDF
导出
摘要 地埋管换热器的施工工艺和施工质量是地埋管地源热泵系统能否安全可靠运行的关键。本文介绍了地埋管换热器的主要施工工艺,并阐述了地埋管换热器施工前的准备、竖直和水平埋管施工、水压试验、管道冲洗及系统校验调试等环节的质量监控要点。 The construction technique and quality of ground heat exchanger with buried pipes is the key point that decides whether the ground-source heat pump system operate safely and reliably.The main construction technique of the heat exchanger is introduced,and the control key points of the quality supervision for the construction preparation,the vertical and horizontal ground heat exchanger construction,the hydraulic pressure tests,the pipeline flushing and the system calibration are expounded.
作者 曾小兵 萧楠
出处 《工程勘察》 CSCD 2012年第4期51-54,共4页 Geotechnical Investigation & Surveying
关键词 地埋管换热器 竖直钻孔 竖直下管 灌浆回填 水压试验 ground heat exchanger with buried pipes vertical bore hole vertical piping grout filling hydraulic pressure test
  • 相关文献

参考文献2

  • 1中华人民共和国国家标准.地源热泵系统工程技术规范(GB-50366-2009)[S].北京:中国建筑工业出版社,2009.
  • 2张银安 李斌 郁云涛.竖直U型地埋管换热器设计施工要点.暖通空调,2008,.

同被引文献6

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部