摘要
介绍了包铝集团公司 1 3 5kA预焙阳极中间下料铝电解槽上部结构氧化铝输送供风系统存在的不足及改进措施 ,取得了很好的节能效果。
The author introduces the shortcomings existing in Alumina delivery air-supply system of supertructure of 135kA prebaked anode pot with centre feeding in Baotou Aluminum Grop (Company) and its improvement.And Better comprehensive results have been gotten.
出处
《有色设备》
2000年第1期17-17,共1页
Nonferrous Metallurgical Equipment
关键词
集中供风
预焙槽
节能
铝电解槽
Central air-supply
Equalizer
Low-pressure Regulating valve