强岩爆隧道施工技术 被引量:1

Techniques for the Construction of Tunnels in Areas of Strong Rock Burst
下载PDF
导出
摘要 锦屏电站辅引3#隧洞埋深超过2 200m,地应力极高,属于强岩爆洞段。施工中采用微震监测方法进行岩爆预测,结合喷洒高压水和岩体深部注水技术、光面爆破及应力解除爆破技术和及时施作锚杆、喷砼等支护措施,大大降低岩爆发生概率和产生严重后果的风险,顺利完成隧洞的开挖施工。 The embedded depth of the 3# auxiliary tunnel of the Jinping Power Station is more than 2,200m,with very high in-situ stress.The tunnel is located in an area of strong rock burst.The microseismic monitoring method of rock burst is used for the prediction of rock burst in the process of construction,with the techniques of spraying high-pressure water and injecting water deep into the body of rocks,smooth-face blasting,stress-relieving blasting and timely providing anchor bolts,shotcreting supporting concrete,etc.adopted in collaboration.The above-mentioned techniques and measures help greatly reduce the probability of rock burst and the risks of serious consequences of rock burst,and ensure the successful completion of the excavation of the tunnel.
作者 李方利
出处 《国防交通工程与技术》 2012年第2期55-58,共4页 Traffic Engineering and Technology for National Defence
关键词 岩爆 隧洞 光面爆破 支护 应力解除爆破 微震监测 rock burst tunnel smooth-faced blasting support stress-relieving blasting procedure microseismic monitoring
  • 相关文献

参考文献2

二级参考文献10

共引文献22

同被引文献4

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部