期刊文献+

基于交替更新过程的随机模糊破产模型

The Random Fuzzy Ruin Model Based on Alternating Renewal Process
原文传递
导出
摘要 构建一个更能刻画保险公司现实运营状况的破产模型,对于保险公司来说具有重要意义。假设索赔额、盈余额和更新过程均是在随机模糊环境下,使得该模型不仅能反映事件的随机性,也能反映决策者的主观性;同时,假设保险公司赔偿时刻滞后与核赔事件发生时刻,建立了交替更新过程。基于以上两点假设,当索赔额和时间间隔均是服从指数分布时,建立了交替更新过程下的随机模糊破产模型,并给出了最终破产概率公式与最终破产机会均值公式。 The establishment of a ruin model is very important to insurance, especially in the aspect of rate setting and reserve accounting. In the paper, claim amount, earnings amount and alternating renewal process were assumed on a random fuzzy basis. Therefore, the randomness of events and the subjectivity of decision makers were consid- ered in the model. At the same time, the paper assumed that the time of compensation by insurance company lagged behind time of the incident, and therefore the alternating renewal process was applied in the model. Based on these two types of assumptions, the paper arrived at an ultimate ruin probability formula and formula of chance mean value of ultimate ruin when claim amount and time interval were consistent with the exponential distribution.
出处 《保险研究》 CSSCI 北大核心 2012年第3期79-86,共8页 Insurance Studies
基金 教育部新新世纪优秀人才计划项目(NCET-10-0375) 国家自然科学基金项目(70971039)
关键词 随机模糊变量 交替更新过程 机会均值 最终破产概率 random fuzzy variable alternating renewal process chance mean value ultimate ruin probability
  • 相关文献

参考文献11

  • 1殷利平,王乃和,吕玉华.一类索赔时间间隔服从混合指数分布的更新风险过程[J].经济数学,2008,25(2):118-125. 被引量:3
  • 2B. Liu, A survy of credibility theory, Fuzzy Optimization and Decision Making ,2006, (5) :387 -408.
  • 3D. Diskson, C. Hipp, Ruin Probabilities for Erlang ( 2 ) risk process, Insurance : Mathematics and Economics, 1998, (22) :251 -262.
  • 4H. Ammeter, A generalization of the collective theory of risk in regard tofluctuating basic probabilities, Skandinavisk Aktuarietidskrift, 1948, ( 3 - 4 ) : 171 - 198.
  • 5Liu B ,Theory and Practice of uncertain Programming, Physica-Verlag, Herdelberg ,2002.
  • 6Liu, Ying, Li Xiaozhong, Yang Guanglei. Reliability Analysis of Random Fuzzy Repairable Series System [ J ]. Fuzzy Information and Engineering,2010, ( 1 ) :281 -296.
  • 7Liu Y K and Liu B. Expected value operator of random fuzzy variable and random fuzzy ecpected value mod- els, International Journal of Uncertainty ,fuzziness and Knowledge-Based Systems ,2003,11 : 195 - 215.
  • 8S. Li, J. Garrido, On ruin for the Erlang (n)risk process, Insurance:Mathematics and Economics, 2004, (34) :391 -408.
  • 9SMandal, S. Maity A. Maity K. , Mondal S. , Maiti M. Multi-item multi-period optimal production problem with variable preparation time in fuzzy stochastic environment[ J] Applied Mathematical Modelling,2011, (35) : 4341 - 4353.
  • 10Stoyan D. Comparison methods for queques and other stochastic models,New York :Wiley, 1983.

二级参考文献4

  • 1Rolski, T., Schmidli, H., et al. Stochastic Process for Insurance and Finance. New York: John Wiley and Sons, 1999.
  • 2David, C., Dickson, M. On a class of renewal risk processes. North American American Actuarial, 1998,2(3):60- 73.
  • 3Yuen, Kam C., Wang Guojing, et al. The Gerber-Shiu expected discounted penalty function for risk processes with interest and a constant dividend barrier. Insurance:Mathematics and Economice. 2007,40:104- 112.
  • 4Chen, Yiqing and Kai W. Ng. The ruin probability of the renewal model with constant interest force and negatively dependent heavy-tailed claims. Insurance : Mathematics and Economics .2007,40:415 - 423.

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部