摘要
基于石家庄翠屏路顶管工程的实践经验,从井点埋设深度、埋设数量及顶力的合理确定等方面,对高水位浅覆土条件下井点法施工关键技术进行了深入分析,对施工工艺进行了优化,并提出了施工质量技术保障措施,解决了顶进过程中的技术难题。
Based on the construction experience of Cuiping Road in Shijiazhuang, crucial construction technology of well point under the conditions of high water level and shallow cover was deeply analysed from aspects of buried depth, point numbers and the determination of jacking force. The construction process was optimized. The technical measures for ensuring construction quality were put forward, and technical problems in jacking progress were solved.
出处
《筑路机械与施工机械化》
2012年第3期51-53,共3页
Road Machinery & Construction Mechanization
关键词
顶管
高水位
施工工艺
动态控制
pipe jacking
high water level
construction technology
dynamic control