摘要 归纳了软件开发项目的几大常见风险,在此基础上,通过集成层次分析法AHP和模糊综合评判法FUZZY的原理和模型,设计出软件开发项目风险评价的指标体系,并运用Delphi方法,让多名专家对各项指标赋权而得出每个指标的权重,之后通过风险因素U到模糊评判评语集V的模糊映射,得到模糊评估矩阵。最后根据FUZZY理论,运用模糊矩阵的合成运算,对软件开发项目风险进行两级评估,从而构建了集成方法下软件开发项目风险评价的过程和模型。结论对软件开发项目管理者具有实际参考价值。 It summarizes several common risks in the software development projects, on this basis, through the integration of AHP and Fuzzy to design evaluation index system of risks in software development projects, and the use of Delphi method, so that more experts on the various indicators of empowerment to derive the weight of each indicator, then got the fuzzy evaluation matrix through fuzzy mapping from U to V. Finally, according to FUZZY theory and fuzzy matrix synthesis operations carried out two risk assessments on software development projects, in order to build a risk assessment process and model of software development projects under the integrated approach. The conclusion references a practical value of the managers in software development projects.
出处 《计算机系统应用》 2012年第4期161-164,共4页 Computer Systems & Applications
关键词 层次分析法 模糊综合评判法 风险评价 软件开发:项目管理 AHP fuzzy comprehensive evaluation risk assessment software development project management
  • 相关文献

参考文献5

  • 1郭兵,沈艳.软件开发实践.北京:清华大学出版社,2009.89-94.
  • 2Chapman C.Estimation and evaluation of uncertainty aminimalist first pass approach.International Journal ofProject Management,2000,45(3):56-59.
  • 3林飞腾.国际工程承包中的项目风险模糊层次分析.陕西师范大学,2009:23-25.
  • 4许先云 杨永清.不确AHP判断矩阵的一致性逼近与排序方法[J].系统工程理论与实践,2009,12(8):189-195.
  • 5王宏涛.模糊综合评判法在软件项目风险分析中的应用[J].西安建筑科技大学学报,2004,.

同被引文献27

  • 1陈铁华.梯级水电站群发电优化调度策略综述[J].水电能源科学,2010,28(10):128-130. 被引量:9
  • 2侯进红,曾旗.企业生产运作系统绩效考核的模糊综合评判模型研究[J].河南理工大学学报(社会科学版),2005,6(4):296-298. 被引量:3
  • 3刘艳,王黎,马光文.发电企业上网电价风险因子识别[J].水力发电,2007,33(1):4-6. 被引量:6
  • 4Damian D, Moitra D. Global sottware development: How far have we come? IEEE SoRwear, 2006, 23(5):17-19.
  • 5Ansgar L, Jtlrgen M, Dieter R. Towards a multi-criteria development distribution model: An analysis of existing task distribution approaches. International Conference Global SoRware Engineering. US. IEEE. 2008. 109-1 18.
  • 6Chua AL, Pan S. Knowledge transfer in offshore insourcing. Proc. of the 27th International Conference on Information Systems. US. Association for Information Systems. 2006. 1039-1053.
  • 7Sakthivel S. Managing risks in offshore systems development Commun. ACM. 2007, 50(4): 69-75.
  • 8Hei CM, Herbsleb JD. End-to-end features as recta-entities for enabling coordination in geographically distributed software development. Software Development Governance. US. IEEE Computer Society. 2009. 21-26.
  • 9Narayan R, Rajesh KB. Globally distributed soft-ware development project performance: An empirical analysis. Proc. of the 6th Joint Meeting of the European Software Engineering Conference and the ACM SIGSOFT Symposium on the Foundations of Soft-ware Engineering. US. ACM. 2007.125-134.
  • 10Michael AC. Managing soil-ware development in globally distributed teams. Communication of the ACM-Alternate Reality Gaming, 2008, 51(2): 15-17.

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部