摘要
结合合蚌客专引入合肥枢纽合肥站的施工准备情况,充分利用既有线零星"天窗"点施工,减少大开通对运输的影响时间。提出了先进的组织理念,合理安排既有线施工。对客运专线引入既有枢纽方案的实施积累了宝贵经验。
In combination with the situation of construction preparation of connecting the Hefei-Bengbu PDL to Hefei hub station,fragmentary skylight slots in the construction plan of existing lines are fully used to minimize the transportation interference time incurring from the open of the construction.The authors proposed advanced ideas for construction organization to make reasonable arrangement for the construction of existing lines,accumulating valuable experiences on those projects of connecting PDLs into a hub station.
出处
《铁道通信信号》
2012年第3期7-9,共3页
Railway Signalling & Communication
关键词
客运专线
站场改造
施工方案
PDL
Reconstruction of station and yard
Construction scheme