摘要
通过几条客运专线ZPW-2000A常见案例的简要介绍,提出建设过程中系统调整方面一些技术性的关注点,期望对相关电务工程人员有所帮助。
Through a brief introduction of several common cases of ZPW-2000As for dedicated passenger line,some concerns about technical adjustment during the process of system construction are put forward in hope of offering help to the CS personnel.
出处
《铁道通信信号》
2012年第3期15-17,共3页
Railway Signalling & Communication
关键词
客运专线
轨道电路
调整
Dedicated passenger line
Track circuit
Adjustment