期刊文献+

申江路立交大跨径钢箱梁吊装施工控制 被引量:2

Hoisting Construction Control of Lon-span Steel Box Girder for Shenjiang Road Grade Separation
下载PDF
导出
摘要 吊装拼装是钢箱梁施工中的关键环节,以上海中环线申江路立交钢箱梁为例,分析了在场地条件和施工条件受限时,钢箱梁分段的划分、临时支墩设置、中央分段和侧边翅膀分段的定位和安装,以及不同分段搭载时的施工控制要点,并通过增设副吊点,改变主副吊点受力大小,解决吊装时产生的挠度变形差异,可为同类工程提供借鉴。 The hoisting assembly is the key link in construction of steel box girder.This paper analyzes the division of steel box girder section,the setting of temporary pier,the orientation and installation of central section and side-wing section,and the construction control gist during the erection of the different sections when the field condition and construction condition are limited by taking the steel box girder of Shenjiang Road Grade Separation in Middle Ring Line of Shanghai as an example.The paper puts forward that the adding of auxiliary lifting point can change the stresses of the main and auxiliary lifting points and solve the deflection deformation difference caused during hoisting,which can be referred for the similar projects.
作者 付强
出处 《城市道桥与防洪》 2012年第3期123-125,12-13,共3页 Urban Roads Bridges & Flood Control
关键词 钢箱梁 吊装 挠度 施工控制 steel box girder,hoisting,deflection,construction control
  • 相关文献

参考文献6

二级参考文献8

共引文献37

同被引文献4

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部