风电机组变桨距系统半实物仿真试验平台 被引量:6

Semi-object simulation test platform for variable pitch system of wind turbine
下载PDF
导出
摘要 为了解决大型风力发电机组出厂前设计整机控制系统试验投入较大问题,针对大型风电机组的变桨距系统半实物仿真平台进行试验研究,并给出了在工厂内进行变桨距控制系统性能测试的解决方案.整个半实物仿真平台采用软件模拟各种工况和载荷情况,以运行控制系统(包含变桨距控制策略)和电动变桨距执行机构为实物形式,通过信息的实时交互完成了控制性能与执行机构的测试及载荷等模拟.仿真结果表明,案例研究有效验证了半实物仿真试验平台的合理性,此方法可以为机组设计和后续生产调试提供可靠的参考依据和验证手段. In order to solve the larger investment problem in testing the whole unit control system of large-scale wind turbine before product delivery,the semi-object simulation platform for variable pitch system of large-scale wind turbine was experimentally investigated.In addition,the solution for the performance test of variable pitch control system in the factory was proposed.For whole semi-object simulation platform,various operating conditions and load situations were simulated with the software.The operating control system containing the varible pitch control strategy and dynamoelectric variable pitch actuator were taken as object form.Moreover,the test of control performance and actuator as well as the load simulation were completed through the real-time interaction of information.The simulation results show that the case study verifies the rationality of the semi-object simulation test platform,and this method can provide the reliable references and verification means for the design and successive adjustment of wind turbine.
出处 《沈阳工业大学学报》 EI CAS 北大核心 2012年第1期15-21,共7页 Journal of Shenyang University of Technology
基金 "十一五"国家科技支撑计划项目(2006BAA01A03) 辽宁省教育厅计划资助项目(2008S169)
关键词 风电机组 变桨距系统 半实物 试验平台 载荷 实时交互 工况 wind turbine variable pitch system semi-object test platform load real-time interaction operating condition
  • 相关文献

参考文献7

  • 1Horiuchi N,Kawahito T.Torque and power limitationsof variable speed wind turbines using pitch control andgenerator power control[C]//IEEE Power Engineer-ing Society Summer Meeting.Vancouver,Canada,2001:638-643.
  • 2姚兴佳,邢作霞,刘颖明,王晓东.变速变距风力发电机组整机协调控制策略研究[J].太阳能学报,2009,30(5):639-644. 被引量:7
  • 3Lin L L,Jiang S D.Design of universal simulationplatform for avionics[C]//Innovative Computing,In-formation and Control 2006,IEEE Computer Society.Piscataway,USA,2006:126-129.
  • 4Bossanyi E A.GH bladed user manual[R].Bristol:Garrad Hassan and Partners Limited,2009.
  • 5Bossanyi E A.GH bladed theory manual[R].Bristol:Garrad Hassan and Partners Limited,2008.
  • 6李强,姚兴佳,陈雷.兆瓦级风电机组变桨距机构分析[J].沈阳工业大学学报,2004,26(2):146-148. 被引量:28
  • 7Lescher F,Zhao J Y,Borne P.Robust gain schedulingcontroller for pitch regulated variable speed wind tur-bine[J].Studies in Informatics and Control,2005,14(12):299-315.

二级参考文献9

共引文献33

同被引文献44

  • 1杨利芳,于开平,庞世伟,邹经湘.用于线性时变结构系统辨识的子空间方法比较研究[J].振动与冲击,2007,26(3):8-12. 被引量:12
  • 2张红光,张粒子,陈树勇,安宁.大容量风电场对电力系统小干扰稳定和阻尼特性的影响[J].电网技术,2007,31(13):75-80. 被引量:71
  • 3刘志国,刘太阳,王仕成,邓方林.基于实时网络的半实物仿真集成平台研究[J].系统仿真学报,2007,19(15):3425-3427. 被引量:24
  • 4王锡凡,方万良,杜正春.现代电力系统分析[M].北京:科学出版社,2007:295.
  • 5Gautam D, Vijay V ,Terry H. Impact of increased pen- etration of DFIG-based wind turbine generators on transient and small signal stability of power systems [ J]. IEEE Transactions on Power Systems, 2009,24 ( 3 ) : 1426 - 1434.
  • 6Gontier C. Energetic classifying of vibration modes in subspace stochastic modal analysis [J].Mechanical Systems and Signal Processing,2005,19( 1 ) :1 -19.
  • 7Lardies J. State-space identification of vibrating sys- tems from multi-output measurements[J].Mechani- cal Systems and Signal Processing, 1998, 12 ( 4 ) : 432 - 447.
  • 8Messina A R, Vittal V. Nonlinear, non-stationary anal- ysis of interarea oscillations via hilbert spectral analy- sis [J].IEEE Transactions on Power Systems,2006, 21 (3) : 1234 - 1241.
  • 9Wang J,Song Y,Li W,et al.Development of a universal platform for hardware in-the-loop testing of microgrids [J],IEEE Transactions on Industrial Informatics,2014,3(8):1-2.
  • 10关宏亮,迟永宁,戴慧珠,杨以涵.异步风电机组接入系统的小干扰稳定及控制[J].电力系统自动化,2008,32(4):54-58. 被引量:53

引证文献6

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部