摘要 在某热电联产机组的调试过程中,发现扩容器的疏水管道异常向外疏水,且存在EH油系统高压油的油压偏低等问题。针对这些问题进行了分析和相关的处理,解决了系统运行中存在的问题,可为以后的调试工作提供借鉴。 Abnormal draining was found in the drain pipe of the flash tank and some problems were also found in EH oil system such as low oil pressure during the commissioning of a combined heat and power generation. Analysis and handling have been carried out in light of all those problems. Problems in the operation have been solved from which the lessons can also been drawn in future commissioning work.
作者 张海丰
出处 《电站辅机》 2012年第1期39-41,共3页 Power Station Auxiliary Equipment
关键词 热电厂 机组 调试 控制 分析 水泵 问题 处理 thermal power plant power unit commissioning control analysis water pump problem handling
  • 相关文献

参考文献2

  • 1上海汽轮机厂.国电大武口热电有限公司热电联产(2×330 MW)机组工程汽轮机使用说明书[R].
  • 2西北电力调试所.国电大武口热电有限公司热电联产(2×330MW)机组工程1号机组汽轮机整套调试措施[R].

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部